
What am I missing from the 4 holes on this tank, on older 4 hole tanks in sure I've seen a manual shut off but why world anybody remove that?
I've already got 2 cylinder tanks onboard, what fittings do I need to connect this in? I'm running 8mm copper from the filler to the T for the existing tanks, can I go into this with another T and Faro pipe to this tank.
From the outlet solenoid I can just go via a one way valve into aT in the feed to the vaporiser, again the existing is all copper, any problem doing part in faro?
It looks like it just hangs from the 2 bolts through the floor into the frame, that seems a little under spec'd to me even with the addition of spreader plates above the floor or am I just over thinking things?
Thanks all.